CHRISTMAS ISLAND AIRPORT

  • Aerobic Treatment Unit (ATU) Sewer System Upgrade
  • 2x 144kL fire water storage tank connections to existing mains
  • New Fire Pumps
  • New Hydrant System
  • Concrete Ring beams & slab
  • Electrical work to the fire hydrant diesel and electric pump controls, ATU control panel and associated cabling
  • Preparation works and organisation prior to shipping of plant and equipment

CLIENT
Christmas Island Airport

MANAGING CONTRACTOR
Toll Remote Logistics Pty Ltd

BUDGET
>$1,000,000

DURATION
6 months