CHRISTMAS ISLAND AIRPORT
- Aerobic Treatment Unit (ATU) Sewer System Upgrade
- 2x 144kL fire water storage tank connections to existing mains
- New Fire Pumps
- New Hydrant System
- Concrete Ring beams & slab
- Electrical work to the fire hydrant diesel and electric pump controls, ATU control panel and associated cabling
- Preparation works and organisation prior to shipping of plant and equipment