FLEET BASE WEST, GARDEN ISLAND (HMAS STIRLING REDEVELOPMENT)
- Stage 3A comprised of 16 project stages
- 65kms of fire, potable water, irrigation, rising main, gravity sewer and sullage piping
- 170,000 manhours
- Sewer Relining
- Direct Current Voltage Gradient testing (DCVG) on the main water to supply
- Refurbishment, repairs and valve replacement to Mild Steel Cement Lined (MSCL) pipelines
- Identification, co-ordination and management of asbestos and Perfluorooctanesulfonic
- Acid (PFAS) contaminated materials
- Operational Defence Base
- 85 FTE Peak Workforce
- 13,000m³ Waste diverted from landfill
- Installation and refurbishment to 14 pump stations
- Reconnection works to the existing fire service within the 3 level wharf