FLEET BASE WEST, GARDEN ISLAND (HMAS STIRLING REDEVELOPMENT)

  • Stage 3A comprised of 16 project stages
  • 65kms of fire, potable water, irrigation, rising main, gravity sewer and sullage piping
  • 170,000 manhours
  • Sewer Relining
  • Direct Current Voltage Gradient testing (DCVG) on the main water to supply
  • Refurbishment, repairs and valve replacement to Mild Steel Cement Lined (MSCL) pipelines
  • Identification, co-ordination and management of asbestos and Perfluorooctanesulfonic
  • Acid (PFAS) contaminated materials
  • Operational Defence Base
  • 85 FTE Peak Workforce
  • 13,000m³ Waste diverted from landfill
  • Installation and refurbishment to 14 pump stations
  • Reconnection works to the existing fire service within the 3 level wharf

CLIENT
Department of Defence

MANAGING CONTRACTOR
Doric Contractors

BUDGET
>$35,000,000

DURATION
21 months